1. Skip to navigation
  2. Skip to content
  3. Skip to sidebar


Skidmore College's GIS Center (under construction) by LPCooper

Want to add this gigapan to your favorites? Log In or Sign Up now.

Log In now to add this Gigapan to a group gallery.

About This Gigapan

Toggle
Taken by
LPCooper LPCooper
Explore score
1
Size
1.89 Gigapixels
Views
413
Date added
Jun 14, 2012
Date taken
Jun 12, 2012
Categories
 
Galleries
Competitions
Tags
Description

The new GIS Center is being constructed in the Lucy Scriber Library on the second floor. It is set to open August 2012.


Gigapan Comments (0)

Toggle Minimize gigapan_comment
The GigaPan EPIC Series, Purchase an GigaPan EPIC model and receive GigaPan Stitch complimentary

Where in the World is this GigaPan?

Toggle
Sorry, this gigapan has no location information.

Stitcher Notes

ToggleMinimize

GigaPan Stitch.Efx version 2.0.0501 (Windows)
Panorama size: 1894 megapixels (47128 x 40196 pixels)
Input images: 224 (14 columns by 16 rows)
Field of view: 211.0 degrees wide by 180.0 degrees high (top=90.0, bottom=-90.0)
Settings:
Vignette correction off
Original image properties:
Camera make: Canon
Camera model: Canon EOS REBEL T2i
Image size: 5184x3456 (17.9 megapixels)
Capture time: 2012-06-12 16:14:49 - 2012-06-12 16:19:48
Aperture: f/1.8 - f/4
Exposure time: 0.008 - 0.0166667
ISO: 100 - 400
Focal length (35mm equiv.): 78.6 mm
White balance: Automatic
Exposure mode: Automatic
Horizontal overlap: 37.5 to 66.6 percent
Vertical overlap: 29.0 to 100.0 percent
Computer stats: 5941.2 MB RAM, 4 CPUs
Total time 12:56:14 (3:28 per picture)
Alignment: 4:51, Projection: 6:22, Blending: 12:45:01
(Preview finished in 54:13)

Member Log In