1. Skip to navigation
  2. Skip to content
  3. Skip to sidebar

Smooth Operator on Bridge B-11 by Robert Holmes

Want to add this gigapan to your favorites? Log In or Sign Up now.

Log In now to add this Gigapan to a group gallery.

About This Gigapan

Taken by
Robert Holmes Robert Holmes
Explore score
2.51 Gigapixels
Date added
Jul 22, 2012
Date taken
Jul 21, 2012

Here the Smooth Operator has installed the final piece of the Bridge known as B-11 of the SR-826/SR-836 Interchange project in Miami, Florida. This unique piece of equipment, affectionately known as SMOOTH OPERATOR (Technically a Launching Gantry) is providing for the assembly of this massive Interchange with 4 flyover bridges covering all four directions with minimal interference to the flow of normal/heavy traffic. The complete bridge assembly is done overhead, WITHOUT the use of cranes to lift the pieces. This is truly a magnificent piece of equipment. It is said that the use of this equipment will cut the overall project construction time by three (3) years.
To see additional gigapans of this fascinating project search on SR-826/SR-836
(Image LG210334-0794A_826-836_Final Connection First Bridge B-11.psb)

Gigapan Comments (0)

Toggle Minimize gigapan_comment
The GigaPan EPIC Series, Purchase an GigaPan EPIC model and receive GigaPan Stitch complimentary

Where in the World is this GigaPan?


Member Log In