1. Skip to navigation
  2. Skip to content
  3. Skip to sidebar


SR-826/SR-836 Bridge 15 with 12 Segments Up & 12 Segments Down as viewed from East at 105mm by Robert Holmes

Want to add this gigapan to your favorites? Log In or Sign Up now.

Log In now to add this Gigapan to a group gallery.

About This Gigapan

Toggle
Taken by
Robert Holmes Robert Holmes
Explore score
1
Size
1.33 Gigapixels
Views
338
Date added
Sep 30, 2012
Date taken
Sep 30, 2012
Categories
 
Galleries
Competitions
Tags
Description

SR-826/SR-836 Bridge 15 with 12 Segments Up & 12 Segments Down as viewed from East at 105mm. This bridge will allow traffic to move from SR-836 West to SR-826 South. This bridge is being assembled with cranes instead of the Launching Gantry used for Bridge 11 because of a tighter radius in Bridge 15. As a result of assembly with cranes it is necessary to shut down all traffic during assembly. To minimize the impact on traffic, SR-826 is shut down between the hours of 11:00 P.M. and 5:00 A.M. and the only assembly of this bridge is accomplished during that 6 hour period, in the dark of night. Even with this handicap this bridge is moving ahead of schedule.

This gigapan was photographed with a Nikon D-800 Camera using a Nikon 28-300mm lens set to 105mm, mounted on a Gigapan Epic-Pro. Mycamera settings were F:16, Shutter @ 1/250 sec. & ISO 200. (Image LI300677-0754_B.psb)


Gigapan Comments (0)

Toggle Minimize gigapan_comment
The GigaPan EPIC Series, Purchase an GigaPan EPIC model and receive GigaPan Stitch complimentary

Where in the World is this GigaPan?

Toggle

Member Log In