SR826-SR836 - Bridge 19, Pier 10 nearly complete by Robert Holmes

Want to add this gigapan to your favorites? Log In or Sign Up now.

Log In now to add this Gigapan to a group gallery.

About This Gigapan

Toggle
Taken by
Robert Holmes Robert Holmes
Explore score
1
Size
2.85 Gigapixels
Views
226
Date added
Apr 19, 2013
Date taken
Apr 19, 2013
Categories
 
Galleries
Competitions
Tags
Description

SR826-SR836 - Bridge 19, Pier 10 nearly complete. If you look carefully at Pier #10 which is supporting the current section of the bridge, you will see that there is a center section called a Pier Section, mounted directly over the Pier. The Pier Section is anchored to the pier and balanced by four huge jacks. Then sections are added one at a time to the left and then to the right to keep the bridge balanced, aided by the jacks. There are currently 11 segments installed on either side of this Pier Section. A full section consists of 12 segments forward and 12 segments back, so there is one more segment to be installed on each side. Then the gap of about 3 foot between the sections will be formed and poured in place. After allowing this poured segment to cure for a few days, the Gantry will be moved to the next Pier and will begin to install the next section. The real beauty of this type of construction is that it is totally overhead and requires no cranes, therefore there are no obstacles (cranes etc.) on the ground to impede traffic so the traffic keeps flowing all during the construction. (Image# MD190123-0239_A.PSB) This gigapan was taken with a Nikon D-800 Camera and the Nikon 28-300mm zoom lens set at 300mm.


Gigapan Comments (0)

Toggle Minimize gigapan_comment
The GigaPan EPIC Series, Purchase an GigaPan EPIC model and receive GigaPan Stitch complimentary

Where in the World is this GigaPan?

Toggle

Member Log In