Log In now to add this GigaPan to a group gallery.
Log In now to add this GigaPan to a gallery.
About This GigaPan
Toggle- Taken by
-
Smith, Alex
- Explore score
- 1
- Size
- 2.40 Gigapixels
- Views
- 520
- Date added
- February 03, 2011
- Date taken
- February 02, 2011
- Categories
- Galleries
- Competitions
- Tags
- bio, fofsep, beta, fofs, canada, biodiversity, ontario, institute
- Description
-
Construction has begun on the Centre for Biodiversity Genomics (CBG) at the University of Guelph.
www.uoguelph.ca/news/2010/04/international_development_alum.html
This has been a wild day. The weather is very bad, and only 3 workers are on site. The university is closed.
This image was taken again from the more forward position as the dumpster has been replaced with a small CAT.
Stitcher Notes
ToggleMinimizeGigaPan Stitch version 1.0.0805 (Windows)
Panorama size: 2403 megapixels (91520 x 26260 pixels)
Input images: 720 (45 columns by 16 rows)
Field of view: 360.0 degrees wide by 103.3 degrees high (top=49.9, bottom=-53.4)
Settings:
All default settings
Original image properties:
Camera make: Canon
Camera model: Canon PowerShot G11
Image size: 3648x2736 (10.0 megapixels)
Capture time: 2011-02-02 12:24:48 - 2011-02-02 13:25:46
Aperture: f/7.1
Exposure time: 0.005
ISO: 100
Focal length (35mm equiv.): 142.3 mm
Digital zoom: off
White balance: Automatic
Exposure mode: Manual
Horizontal overlap: 41.0 to 89.5 percent
Vertical overlap: 39.1 to 47.0 percent
Computer stats: 2790.7 MB RAM, 2 CPUs
Total time 1:36:50 (8.1 seconds per picture)
Alignment: 54:39, Projection: 6:22, Blending: 35:48
(Preview finished in 1:10:29)

fetching snapshots...
GigaPan Comments (0)
Toggle Minimize gigapan_comment