1. Skip to navigation
  2. Skip to content
  3. Skip to sidebar


Centre for Biodiversity Genomics - Construction - 15 - 110215 by Smith, Alex

Want to add this gigapan to your favorites? Log In or Sign Up now.

Log In now to add this Gigapan to a group gallery.

About This Gigapan

Toggle
Taken by
Smith, Alex Smith, Alex
Explore score
1
Size
2.40 Gigapixels
Views
548
Date added
Feb 15, 2011
Date taken
Feb 15, 2011
Categories
 
Galleries
Competitions
Tags
Description

Construction has begun on the Centre for Biodiversity Genomics (CBG) at the University of Guelph.

www.uoguelph.ca/news/2010/04/international_development_alum.html Will open in a new tab or window
Today is truly a great day. I have returned to the original shooting spot. The sun feels bright today, spring is near. I can feel it somehow, perhaps the angle of the sun.
Work has started on the 1st floor deck.


Gigapan Comments (0)

Toggle Minimize gigapan_comment
The GigaPan EPIC Series, Purchase an GigaPan EPIC model and receive GigaPan Stitch complimentary

Where in the World is this GigaPan?

Toggle

Stitcher Notes

ToggleMinimize

GigaPan Stitch version 1.0.0805 (Windows)
Panorama size: 2399 megapixels (91504 x 26224 pixels)
Input images: 704 (44 columns by 16 rows)
Field of view: 360.0 degrees wide by 103.2 degrees high (top=54.5, bottom=-48.7)
Settings:
All default settings
Original image properties:
Camera make: Canon
Camera model: Canon PowerShot G11
Image size: 3648x2736 (10.0 megapixels)
Capture time: 2011-02-15 10:12:58 - 2011-02-15 11:05:45
Aperture: f/8
Exposure time: 0.003125
ISO: 100
Focal length (35mm equiv.): 142.3 mm
Digital zoom: off
White balance: Automatic
Exposure mode: Manual
Horizontal overlap: 34.8 to 82.1 percent
Vertical overlap: 36.7 to 51.2 percent
Computer stats: 2790.7 MB RAM, 2 CPUs
Total time 1:30:20 (7.7 seconds per picture)
Alignment: 45:27, Projection: 6:55, Blending: 37:58
(Preview finished in 1:01:53)

Member Log In