Log In now to add this GigaPan to a group gallery.
Log In now to add this GigaPan to a gallery.
About This GigaPan
Toggle- Taken by
-
Smith, Alex
- Explore score
- 1
- Size
- 2.40 Gigapixels
- Views
- 563
- Date added
- April 14, 2011
- Date taken
- April 14, 2011
- Categories
- Galleries
- Competitions
- Tags
- institute, beta, fofsep, canada, biodiversity, bio, fofs, ontario
- Description
-
Construction is now about half complete on the Centre for Biodiversity Genomics (CBG) at the University of Guelph.
www.uoguelph.ca/news/2010/04/international_development_alum.html
The building is now showing its own form. Today more concrete is being poured.
Check out the panorama using the Google Earth plugin here:43.52874, -80.228638, 230, 10
Stitcher Notes
ToggleMinimizeGigaPan Stitch version 1.0.0805 (Windows)
Panorama size: 2395 megapixels (91512 x 26172 pixels)
Input images: 704 (44 columns by 16 rows)
Field of view: 360.0 degrees wide by 103.0 degrees high (top=54.6, bottom=-48.3)
Settings:
All default settings
Original image properties:
Camera make: Canon
Camera model: Canon PowerShot G11
Image size: 3648x2736 (10.0 megapixels)
Capture time: 2011-04-14 09:16:33 - 2011-04-14 10:21:29
Aperture: f/8
Exposure time: 0.002
ISO: 100
Focal length (35mm equiv.): 142.3 mm
Digital zoom: off
White balance: Automatic
Exposure mode: Manual
Horizontal overlap: 39.5 to 81.7 percent
Vertical overlap: 35.9 to 52.2 percent
Computer stats: 2790.7 MB RAM, 2 CPUs
Total time 1:21:47 (7.0 seconds per picture)
Alignment: 39:22, Projection: 6:14, Blending: 36:11
(Preview finished in 55:28)

fetching snapshots...
GigaPan Comments (0)
Toggle Minimize gigapan_comment