1. Skip to navigation
  2. Skip to content
  3. Skip to sidebar


Construction at Auburn University by Christopher Arnold

Want to add this gigapan to your favorites? Log In or Sign Up now.

Log In now to add this Gigapan to a group gallery.

About This Gigapan

Toggle
Taken by
Christopher Arnold Christopher Arnold
Explore score
1
Size
0.91 Gigapixels
Views
3434
Date added
Sep 25, 2008
Date taken
Sep 25, 2008
Gear

Canon G9

Categories
 
Galleries
Competitions
Tags
Description

$300M in construction underway on the Auburn University campus.

"The Village" student housing project (1700 +/- beds) including dining facilities (near right) fills the background. Towards the near left, you can see the angled forms in place for a new 243,792 sq.ft. basketball arena and practice facility opening prior to the 2010-11 season.


Gigapan Comments (0)

Toggle Minimize gigapan_comment
The GigaPan EPIC Series, Purchase an GigaPan EPIC model and receive GigaPan Stitch complimentary

Where in the World is this GigaPan?

Toggle

Stitcher Notes

ToggleMinimize

GigaPan Stitcher version 0.4.2733 (Macintosh)
Panorama size: 908 megapixels (65206 x 13936 pixels)
Input images: 132 (22 columns by 6 rows)
Field of view: 164.2 degrees wide by 35.1 degrees high (top=14.2, bottom=-20.9)
Settings:
All default settings
Original image properties:
Camera make: Canon
Camera model: Canon PowerShot G9
Image size: 4000x3000 (12.0 megapixels)
Aperture: f/7.1
Exposure time: 0.004
ISO: 80
Focal length (35mm equiv.): 207.7 mm
Digital zoom: off
White balance: Fixed
Exposure mode: Manual
Has subsecond timestamp: no
Horizontal overlap: 25.0 to 30.6 percent
Vertical overlap: 25.8 to 27.5 percent
Computer stats: 2048 MB RAM, 2 CPUs
Total time 1:54:30 (0:52 per picture)
Alignment: 9:56, Projection: 13:15, Blending: 1:31:19

Member Log In